SurveyThanks
Who it’s forSign inSee pricing
  1. Disciplines
  2. /
  3. Environmental
  4. /
  5. Phase 1 site assessments

Phase 1 environmental site assessment software

A Phase 1 environmental site assessment is mostly desktop research — title history, aerial photographs, council records, regulator registers — plus a site walkover that confirms or contradicts what the records suggest. The buyer, usually a purchaser or lender, needs a list of areas of environmental concern and a view on whether intrusive investigation is warranted. The walkover is where the evidence gets lost: photos on a phone, notes in a notebook, and the link between them reconstructed later.

Built for environmental consultants running teams of roughly 3–50 inspectors.

See pricingMore environmental work

Sample ESA report

An illustrative excerpt. The site, readings and findings are fictional; the layout is yours to set.

ESA report

Section 6 — Site walkover observations

Site
Lot 4, 88 Industrial Crescent (fictional)
Inspection
3 June 2026
Current use
Vacant warehouse, former panel beating workshop
Section 6 — Site walkover observations
AreaObservationAssessment
Workshop floorOil staining around two former hoist pitsAssessment: AEC
Rear yardFill mound with brick and tile fragmentsAssessment: AEC
Paint boothBooth removed; extraction ducting remainsAssessment: Note
Site boundaryNo visible stressed vegetation or seepageAssessment: No concern
The walkover confirmed the historical workshop use identified in the 1978 and 1994 aerial photographs. Two areas of environmental concern are carried forward: the former hoist pits, where staining suggests hydrocarbon impact to the slab and possibly underlying soil, and the fill mound in the rear yard, whose origin is unknown and which may contain asbestos-containing building rubble.

Fields captured on site

Your firm builds the form in-app, so these are a starting point rather than a fixed schema. Every field is captured on the device, with or without signal, and lands in the ESA report where your template puts it.

Walkover

  • Area or building
  • Observation and photo
  • Potential contaminant source
  • Area of environmental concern (yes / no)

Site setting

  • Current and adjoining land uses
  • Surface water and drainage
  • Evidence of fill, tanks or stockpiles

Desktop record

  • Aerial photograph years reviewed
  • Title search summary
  • Regulator notices and register hits
  • Interviews held

Standards the report works to

NEPM 1999 (amended 2013)National Environment Protection (Assessment of Site Contamination) Measure
Schedule B2 sets out the site characterisation process a preliminary investigation belongs to.
AS 4482.1-2005Guide to the investigation and sampling of sites with potentially contaminated soil
Describes the preliminary site history work that frames any sampling recommended.

Load the standards you hold into your reference library and the drafted prose is written against them rather than against a general model.

How the ESA report gets built

Capture it once, offline

Your firm builds the phase 1 site assessment form in-app — 25 field types, nesting repeatable groups, compound AND/OR visibility rules, reusable modules and calculated fields. Field capture works with no signal: jobs, forms, photos, notes and audio all queue in an idempotent outbox that only clears once the server confirms receipt.

Link it to your sample locations

Enter sample locations once, as a register. Every one of your samples, bores and monitoring rounds then points at a stored row rather than a name somebody typed — and the links survive a disconnected device.

Render your own template

The ESA report renders into the Word template you already use — your letterhead, your section order, your clause library — with conditionals, loops over repeats, composable sub-templates and photo grids.

Reviewed before it leaves

You write the review framework: a checklist of what a ESA report must contain, plus the prose standards you would mark a junior against. Link it to a report template and it runs every time that template renders. Each finding comes back graded info, minor or major, quoting the sentence at fault, and a person accepts or dismisses every one.

Because the structured submission behind the report is held too, the review is a comparison rather than a proofread: The report says every bore was sampled to three metres; the form has BH07 refused at 1.2 m.

Checks a environmental framework usually carries

  • Every exceedance in the results tables is discussed in the assessment text
  • The guideline values cited match the land use actually being assessed
  • No sample or bore ID appears in the prose that is absent from the data
  • Data gaps, refusals and deviations from the sampling plan are stated as limitations

Questions

Can walkover photos be tied to a specific area of concern?
Yes. Areas are a repeatable group with their own photos and notes, so each photo in the report sits under the area it documents.
Can the history section be drafted from our desktop notes?
An AI marker in your template can draft a paragraph from the captured records, grounded in your own reference documents. A consultant reviews and edits the draft before it is issued.
Will the report flag that no intrusive work was done?
Your review framework can require the limitations section to state the scope, and the report review checks for it before the document leaves.

What this is not

Worth knowing before you book a demo, so neither of us wastes the half hour.

  • Not field-service dispatch. No timesheets, no parts, no inventory. Scheduling exists to get an inspector to a site.
  • No signature capture. If your deliverable has to carry a signed sign-off on the artefact itself, this is not the tool yet.
  • Field capture is what works offline — jobs, forms, photos, notes and audio. Reports, chat, scheduling and the inbox need a connection.
  • No client portal. Reports go out as a file or a password-protected link.

Other environmental work we cover

  • Wetland condition assessmentsWetland health report
  • Acid sulfate soil inspectionsASS management report
  • Air quality monitoring roundsAir monitoring report
  • Asbestos in soil surveysACM in soil report
  • Asbestos registers and reinspectionsAsbestos register update
  • Beach water quality samplingBeach watch report
  • Carbon project monitoringCarbon audit evidence
  • Contaminated land auditsAudit evidence pack

Other disciplines

  • Ecology
  • Insurance
  • Commercial property
  • Residential property
  • Surveying
  • Valuation
  • Heritage
  • WHS consulting
  • Fire safety

Rebuild your ESA report in SurveyThanks

Bring the Word template you already send clients. If you are coming off another field-forms tool, a filled report can be uploaded, read field by field, and re-rendered into your template.

See pricingBook a walkthrough (opens in a new tab)
HomeDisciplinesPricingReport templatesPrivacyTermsSupport

SurveyThanks is a product of Swap Link Pty Ltd (ABN 94 691 733 794), Brisbane, Australia.