SurveyThanks
Who it’s forSign inSee pricing
  1. Disciplines
  2. /
  3. Environmental
  4. /
  5. Asbestos in soil surveys

Asbestos in soil survey and reporting app

Asbestos in soil turns up on demolition sites, in imported fill and on former industrial land, and it is assessed differently from chemical contamination: fragments are collected from the surface or from test pits, weighed, and expressed as a concentration of bonded or friable asbestos in the soil. The report needs every test pit, its sieved soil mass and fragment weights recorded consistently, because the concentration is only as good as those two numbers.

Built for consultants running teams of roughly 3–50 inspectors.

See pricingMore environmental work

Sample ACM in soil report

An illustrative excerpt. The site, readings and findings are fictional; the layout is yours to set.

ACM in soil report

Table 2 — Test pit gravimetric results (field)

Site
Former dairy, 140 Paddock Road (fictional)
Sampling
10 L soil volume per sample, sieved at 7 mm
Date
28 May 2026
Table 2 — Test pit gravimetric results (field)
Test pitFill descriptionFragments recoveredStatus
TP01Clayey fill with brick, 0–0.6 m3 fragments, 18 gStatus: Lab confirm
TP02Topsoil over natural clayNone observedStatus: None
TP04Ash and demolition rubble, 0–1.2 m11 fragments, 64 gStatus: Lab confirm
Surface walk 3Fragment field near former shed pad22 fragments collectedStatus: Lab confirm
Suspected bonded asbestos fragments were recovered from fill at TP01 and TP04 and from the surface near the former shed pad. Fragments have been submitted for identification. Fill at TP04 contains ash and demolition rubble to 1.2 m and is the likely source; delineation pits around TP04 are recommended.

Fields captured on site

Your firm builds the form in-app, so these are a starting point rather than a fixed schema. Every field is captured on the device, with or without signal, and lands in the ACM in soil report where your template puts it.

Per test pit

  • Location and map point
  • Depth and fill profile
  • Soil volume and mass sieved
  • Fragment count and mass
  • Friable material observed

Surface inspection

  • Transect or grid cell
  • Fragments collected
  • Photo

Samples

  • Sample ID
  • Laboratory identification result

Standards the report works to

NEPM 1999 (amended 2013)National Environment Protection (Assessment of Site Contamination) Measure
Schedule B1 includes the health screening levels for asbestos in soil.
WA Department of HealthGuidelines for the Assessment, Remediation and Management of Asbestos-Contaminated Sites in Western Australia
The gravimetric approach the NEPM screening levels are based on.
AS 4964-2004Method for the qualitative identification of asbestos in bulk samples
Laboratory confirmation of the fragments recovered.

Load the standards you hold into your reference library and the drafted prose is written against them rather than against a general model.

How the ACM in soil report gets built

Capture it once, offline

Your firm builds the asbestos in soil survey form in-app — 25 field types, nesting repeatable groups, compound AND/OR visibility rules, reusable modules and calculated fields. Field capture works with no signal: jobs, forms, photos, notes and audio all queue in an idempotent outbox that only clears once the server confirms receipt.

Link it to your sample locations

Enter sample locations once, as a register. Every one of your samples, bores and monitoring rounds then points at a stored row rather than a name somebody typed — and the links survive a disconnected device.

Render your own template

The ACM in soil report renders into the Word template you already use — your letterhead, your section order, your clause library — with conditionals, loops over repeats, composable sub-templates and photo grids.

Reviewed before it leaves

You write the review framework: a checklist of what a ACM in soil report must contain, plus the prose standards you would mark a junior against. Link it to a report template and it runs every time that template renders. Each finding comes back graded info, minor or major, quoting the sentence at fault, and a person accepts or dismisses every one.

Because the structured submission behind the report is held too, the review is a comparison rather than a proofread: The report says every bore was sampled to three metres; the form has BH07 refused at 1.2 m.

Checks a environmental framework usually carries

  • Every exceedance in the results tables is discussed in the assessment text
  • The guideline values cited match the land use actually being assessed
  • No sample or bore ID appears in the prose that is absent from the data
  • Data gaps, refusals and deviations from the sampling plan are stated as limitations

Questions

Can the form calculate a concentration from the weights?
A calculated field can divide fragment mass by soil mass for each pit, so the field estimate is in the record before laboratory confirmation arrives.
How are surface pickups recorded alongside test pits?
Surface inspection and test pits are separate repeatable groups on the same job, each with photos, so the report can present them as two tables.
Can delineation pits be linked to the pit they are chasing?
Yes, through a reference field: each step-out pit points at the original location it delineates.

What this is not

Worth knowing before you book a demo, so neither of us wastes the half hour.

  • Not field-service dispatch. No timesheets, no parts, no inventory. Scheduling exists to get an inspector to a site.
  • No signature capture. If your deliverable has to carry a signed sign-off on the artefact itself, this is not the tool yet.
  • Field capture is what works offline — jobs, forms, photos, notes and audio. Reports, chat, scheduling and the inbox need a connection.
  • No client portal. Reports go out as a file or a password-protected link.

Other environmental work we cover

  • Landfill gas monitoringGas monitoring report
  • Litter auditsLitter count report
  • Noise monitoring surveysAcoustic report
  • Odour surveysOdour assessment report
  • Pest animal control programsControl program report
  • Phase 1 site assessmentsESA report
  • Phase 2 contamination samplingSampling analysis report
  • Rehabilitation monitoringRehab progress report

Other disciplines

  • Ecology
  • Insurance
  • Commercial property
  • Residential property
  • Surveying
  • Valuation
  • Heritage
  • WHS consulting
  • Fire safety

Rebuild your ACM in soil report in SurveyThanks

Bring the Word template you already send clients. If you are coming off another field-forms tool, a filled report can be uploaded, read field by field, and re-rendered into your template.

See pricingBook a walkthrough (opens in a new tab)
HomeDisciplinesPricingReport templatesPrivacyTermsSupport

SurveyThanks is a product of Swap Link Pty Ltd (ABN 94 691 733 794), Brisbane, Australia.