SurveyThanks
Who it’s forSign inSee pricing
  1. Disciplines
  2. /
  3. Fire safety
  4. /
  5. Fire safety statement audits

AFSS inspection software for fire safety practitioners

In New South Wales a building owner must give the council and Fire and Rescue NSW an annual fire safety statement confirming each essential fire safety measure on the building’s fire safety schedule has been assessed. The practitioner works through that schedule measure by measure, records the evidence and flags anything not performing to its standard of performance. The evidence pack is what supports the statement if it is ever questioned.

Built for fire consultants running teams of roughly 3–50 inspectors.

See pricingMore fire safety work

Sample AFSS evidence pack

An illustrative excerpt. The site, readings and findings are fictional; the layout is yours to set.

AFSS evidence pack

Essential fire safety measures — evidence summary

Building
Fictional Arcade, 77 Notional Street
Fire safety schedule
Issued with occupation certificate, 2015
Assessment period
Ending 30 September 2026
Essential fire safety measures — evidence summary
MeasureStandard of performanceResult
Automatic fire detection and alarmAS 1670.1Result: Performing
Emergency lightingAS/NZS 2293.1Result: Not performing
Fire doorsAS 1905.1Result: Performing
Portable fire extinguishersAS 2444Result: Evidence pending
Eleven of the thirteen measures on the schedule were assessed as performing. Three emergency luminaires in the rear service corridor failed their discharge test and must be replaced before the statement is issued. Service records for the portable extinguishers have been requested from the contractor and that measure remains open.

Fields captured on site

Your firm builds the form in-app, so these are a starting point rather than a fixed schema. Every field is captured on the device, with or without signal, and lands in the AFSS evidence pack where your template puts it.

Per essential fire safety measure

  • Measure (from the fire safety schedule)
  • Standard of performance
  • Assessed by
  • Date assessed
  • Performing (yes / no)
  • Evidence reference
  • Photos

Building

  • Fire safety schedule date
  • Council and FRNSW details
  • Previous statement date

Open items

  • Linked measure
  • What is outstanding
  • Responsible party

Standards the report works to

EP&A (Development Certification and Fire Safety) Regulation 2021Environmental Planning and Assessment (Development Certification and Fire Safety) Regulation 2021 (NSW)
Requires the annual fire safety statement and sets what each measure must be assessed against.
AS/NZS 2293.1Emergency lighting and exit signs for buildings — System design, installation and operation
A typical standard of performance listed on a fire safety schedule for emergency lighting.

Load the standards you hold into your reference library and the drafted prose is written against them rather than against a general model.

How the AFSS evidence pack gets built

Capture it once, offline

Your firm builds the fire safety statement audit form in-app — 25 field types, nesting repeatable groups, compound AND/OR visibility rules, reusable modules and calculated fields. Field capture works with no signal: jobs, forms, photos, notes and audio all queue in an idempotent outbox that only clears once the server confirms receipt.

Link it to your buildings, fire compartments and rated elements

Enter buildings, fire compartments and rated elements once, as a register. Every one of your penetrations, defects and rectification items then points at a stored row rather than a name somebody typed — and the links survive a disconnected device.

Render your own template

The AFSS evidence pack renders into the Word template you already use — your letterhead, your section order, your clause library — with conditionals, loops over repeats, composable sub-templates and photo grids.

Reviewed before it leaves

You write the review framework: a checklist of what a AFSS evidence pack must contain, plus the prose standards you would mark a junior against. Link it to a report template and it runs every time that template renders. Each finding comes back graded info, minor or major, quoting the sentence at fault, and a person accepts or dismisses every one.

Because the structured submission behind the report is held too, the review is a comparison rather than a proofread: The report says sprinkler coverage is throughout; the form records the warehouse only.

Checks a fire safety framework usually carries

  • Every rated element assessed carries a defect status, not just a description
  • A BAL determination shows the inputs it was derived from
  • Non-conformances cite the clause of the standard they fail
  • Rectification items are specific enough for a contractor to price

Questions

Can each measure carry its own evidence?
Yes. Each measure on the schedule is a row with its own result, evidence reference and photos, so the evidence pack is ordered exactly as the fire safety schedule is.
Does the software lodge the statement with council?
No. It produces your evidence pack and the report in your own template; lodging the statement stays with the owner or their agent.
Can a subcontractor’s service report be checked as evidence?
An uploaded PDF or Word report can be run through the review screen against your own checklist, so gaps in a contractor’s record show up before you rely on it.
Does this work for essential safety measures in other states?
The form is yours, so the same approach works for other states’ maintenance regimes — you build a form around that state’s list of measures.

What this is not

Worth knowing before you book a demo, so neither of us wastes the half hour.

  • Not field-service dispatch. No timesheets, no parts, no inventory. Scheduling exists to get an inspector to a site.
  • No signature capture. If your deliverable has to carry a signed sign-off on the artefact itself, this is not the tool yet.
  • Field capture is what works offline — jobs, forms, photos, notes and audio. Reports, chat, scheduling and the inbox need a connection.
  • No client portal. Reports go out as a file or a password-protected link.

Other fire safety work we cover

  • Bushfire attack level assessmentsBAL report
  • Bushfire hazard reduction auditsHazard reduction report
  • Evacuation diagram auditsDiagram compliance report
  • Evacuation drill recordsDrill observation report
  • Fire damper testingDamper test report
  • Fire hydrant testingHydrant flow test report
  • Fire trail condition auditsTrail condition report
  • Passive fire penetration surveysPenetration register

Other disciplines

  • Environmental
  • Ecology
  • Insurance
  • Commercial property
  • Residential property
  • Surveying
  • Valuation
  • Heritage
  • WHS consulting

Rebuild your AFSS evidence pack in SurveyThanks

Bring the Word template you already send clients. If you are coming off another field-forms tool, a filled report can be uploaded, read field by field, and re-rendered into your template.

See pricingBook a walkthrough (opens in a new tab)
HomeDisciplinesPricingReport templatesPrivacyTermsSupport

SurveyThanks is a product of Swap Link Pty Ltd (ABN 94 691 733 794), Brisbane, Australia.